Future Fens flood risk management
Fens flood risk management baseline report now available.
From:
11 May 2021
Phase 1 of the flood risk management work started 3 years ago, to develop a shared understanding of the flood risk challenges in the Great Ouse Fens of Cambridgeshire and Norfolk.
Future activity will build on this baselining work to develop flood management options that can deliver flood and drainage infrastructure needed for future generations.
This work is delivering on key commitments to the Fens as featured in the National Flood and Coastal Erosion Risk Management Strategy (FCERM) published in 2020.
With a third of the Fens currently below sea level, the area has a network of flood protection assets that are owned and managed by different organisations. Much of this infrastructure is nearing the end of its design life and will soon need significant investment. With the increasing effects of climate change, flood infrastructure is key in providing water resources, environmental, navigation and wider amenity services.