comparemela.com


Falcon Oil & Gas Notes Arrival Of Tubing Equipment At Kyalla 117 Well
Thu, 24th Dec 2020 14:15
(Alliance News) - Falcon Oil & Gas Ltd on Thursday reported that a coiled tubing unit and necessary consumables have arrived at the Kyalla 117 N2-1H ST2 well in the Beetabloo sub-basin, onshore Australia.
Earlier in December, a joint venture between Falcon and Australian energy firm Origin Energy Ltd said it would start operations to re-enter Kyalla 117 with coiled tubing, applying nitrogen to lower the pressure in the wellbore and help with achieving a gas breakthrough.
Life operations are expected to start in the next few days, and if successful, could allow for extended production testing.

Related Keywords

Australia ,London ,City Of ,United Kingdom ,Australian ,Dayo Laniyan ,Falcon Oil Gas Ltd On ,Origin Energy Ltd ,Alliance News ,Falcon Oil Gas ,Gas Ltd ,Falcon Oil ,All Rights ,ஆஸ்திரேலியா ,லண்டன் ,நகரம் ஆஃப் ,ஒன்றுபட்டது கிஂக்டம் ,ஆஸ்திரேலிய ,ஃபால்கன் எண்ணெய் வாயு லிமிடெட் ஆன் ,ஆரிஜிந் ஆற்றல் லிமிடெட் ,கூட்டணி செய்தி ,ஃபால்கன் எண்ணெய் வாயு ,வாயு லிமிடெட் ,ஃபால்கன் எண்ணெய் ,அனைத்தும் உரிமைகள் ,

© 2024 Vimarsana

comparemela.com © 2020. All Rights Reserved.