The chequered flag has flown for the final time in 2020, with Max Verstappen shocking Mercedes by claiming the last win of the year – and by some margin too. So, with the season now at an end, we round up the star performers from the Abu Dhabi Grand Prix – and scroll down to see which drivers were ranked the highest across the season as a whole. HOW IT WORKS Our five-judge panel assesses each driver after every Grand Prix and scores them out of 10 according to their performance across the weekend – taking machinery out of the equation Our experts’ scores are then averaged out to produce a race score – with those scores then tallied up across the season on our overall Power Rankings Leaderboard (at the bottom of the page)