Work to resume at the Route 283 interchange project in Lancaster County: PennDOT
Updated Mar 10, 2021;
Posted Mar 10, 2021
Weather permitting, from 9 p.m. Monday to 6 a.m. Tuesday, there will be lane closures in both eastbound and westbound directions on Route 283 at the interchange
Facebook Share
Work will resume next week at a widening and reconstruction project at the Route 283 interchange with Route 722 (Landisville) in Lancaster County.
Weather permitting, from 9 p.m. Monday to 6 a.m. Tuesday, there will be lane closures in both eastbound and westbound directions on Route 283 at the interchange so the contractor can set barrier along the shoulder of the highway, a press release said. The contractor will set barrier on the eastbound side first, then move operations to the westbound side.
Online plans display available for Lebanon County bridge replacement project: PennDOT
Updated Mar 01, 2021;
Posted Mar 01, 2021
The project consists of replacing the over 90-year old two-span concrete arch structure, approach pavement replacement, placement of rock scour protection and guide rail updates.
Facebook Share
The Pennsylvania Department of Transportation (PennDOT) invites the public to an online plans display for the Route 72 (Ebenezer Road) bridge replacement project in Swatara and Union Townships, Lebanon County. The bridge spans Swatara Creek approximately 1.5 miles south of the intersection of Route 72 and Route 22.
The project consists of replacing the over 90-year old two-span concrete arch structure, approach pavement replacement, placement of rock scour protection and guide rail updates, a press release said.