Illustrative photo (Source: VNA)
Hanoi (VNA) - With
repair work on some international
undersea cables now underway, Vietnam’s
internet connection with the world is expected to be fully restored on February
24.
The repair of the Tata
TGN-Intra Asia (IA) cable system’s broken sections began on February 18. The IA
management board said the work is scheduled to be completed on February 24.
Earlier, the system’s branches S1, S5, and FP1 were found to be faulty.
The IA, stretching 6,800 km,
connects Singapore, Vietnam, the Philippines, Hong Kong (China), and Japan.
With designed transmission speeds of 3.84 Tbps, it is an important cable
Internet connection expected to return to normal on February 24 Chia sẻ | FaceBookTwitter Email Copy Link Copy link bài viết thành công
18/02/2021 19:51 GMT+7
With repair work on some international undersea cables now underway, Vietnam’s internet connection with the world is expected to be fully restored on February 24.
Illustrative photo (Source: VNA)
The repair of the Tata TGN-Intra Asia (IA) cable system’s broken sections began on February 18. The IA management board said the work is scheduled to be completed on February 24. Earlier, the system’s branches S1, S5, and FP1 were found to be faulty.
The IA, stretching 6,800 km, connects Singapore, Vietnam, the Philippines, Hong Kong (China), and Japan. With designed transmission speeds of 3.84 Tbps, it is an important cable transferring data from Vietnam and other Asian destinations to America and E