For The Maui News
Maui Nui is approaching an almost implausible anniversary one year since the arrival of COVID-19. We decided early on that UH-Maui College would be “all in.” We would communicate regularly, welcome every innovative idea, partner with the public and private sectors, deploy every resource human and otherwise to keep our campus safe, keep our students learning, and do what we could to help our county. We knew it would be a Herculean task. And we knew we could do it because we are fortunate to have a deep bench of faculty, staff, students and community supporters with an awesome range of knowledge and capabilities.
TORONTO - Some of the most active companies traded Tuesday on the Toronto Stock Exchange:Toronto Stock Exchange (17,543.43, down 80.45 points.) Suncor Energ
“Produced water” is a byproduct of oil and gas extraction and sometimes contains residual petroleum and chemicals and on its website, the Alberta Energy Regulator estimated the Christmas Day spill at about 400 cubic metres (400,000 litres or 2,500 barrels).
A pump jack located near the town of Drayton Valley is pictured in this file photo. (Kory Siegers/CBC)
The water first flowed into a creek before moving to the North Saskatchewan River, which flows east through Edmonton and into central Saskatchewan, where it meets the South Saskatchewan River and eventually flows into Hudson Bay.
A spokesperson for the Calgary-based oil and gas producer that owns the pipeline, ARC Resources Ltd., told reporters Tuesday the leak has had no detectable impact on local waterways and wildlife.
Pipeline spills about 400,000 litres
Some enters North Saskatchewan River December 29, 2020 by Dan Healing, The Canadian Press, Calgary
Contaminated water that leaked from an oilfield pipeline on Christmas Day has entered the North Saskatchewan River but has had no detectable impact on it, says a spokesman for Calgary-based oil and gas producer ARC Resources Ltd.
The spill was reported by a local landowner at about 2 p.m. last Friday, said Sean Calder, ARC’s vice-president of production, in an interview on Tuesday.
“We had guys on site within about an hour and then the pipeline was shut in by 4 p.m., I believe,” he said.