St David s Hall in Cardiff is closing until 2025 due to concerns about deteriorating concrete. The entire roof of the hall needs to be replaced. The repair could take about 18 months to complete. Public buildings in the UK have been dealing with problems caused by reinforced autoclaved aerated concrete (RAAC).