There are industrial estates extremely close to this site which would be more appropriate. The reason why the existing Headley Road East site was no longer available (their words) was not provided. There was no technical reason provided about the original site. The last couple of times an application to change a phone mast to cater for 5G was on the St John’s Ambulance site and the single lane bridge on Duffield Road. In both these cases they used the same site for the new capability. So I would really like to know why the current site is no longer available. If it is for technical reasons I think they would have said so!