POCOMOKE CITY, Md.-The Maryland Department of Transportation State Highway Administration says it will begin a pipe replacement project on MD 371 (Cedar Hall Road) just south of Pit Circle Road
insights from industryPaul WehnertExecutive Vice PresidentHeath Consultants Incorporated
In this interview, AZoSensors talks to Paul Wehnert, Executive Vice President at Heath Consultants Incorporated, about the company, their role in leak detection, and how they approach their work.
Please could you provide an overview of Heath Consultants and the work they do?
Heath Consultants Incorporated (HCI) was established in 1933 and currently in our 88
th year of business. HCI operates in three (3) business units; The
Services Business Unit (SBU) provides Natural Gas Pipeline Leak Detection, Underground Utility Locating, and Meter Services. The
Products Business Unit (PBU) provides the manufacturing and distribution of Natural Gas Leak Detection Instruments, Underground Pipe & Cable Locators, and Odorant Level Testing equipment for Natural Gas.
of the stack 87 days into the disaster. see the before and the after. now it s a question of seeing if the cap, 13 thousand feet of underground pipe, even the sea floor around it can stand up to all of that pressure. let s listen. i have to stress, we have to manage our expectations because depending on what the results are could depend on what happens next. that s doug suttles. to see what is actually happening, they are watching the pressure on the pipes and doing seismic testing on the sea floor, literally measuring the depending on what they learn, this picture could change. if they don t leave the welcome pleatly shut in, they could hook up a pair of tankers. remember, there s now 87 days worth of oil still in the water and all over the gulf coast. which is why james carville, who you will hear from in a moment,