The Anji Khad bridge, India s first cable-stayed bridge, was completed in 11 months, and the total length of cable strand used in the bridge is 653 km.
Srinagar, April 29: In a significant development, all 96 cables are fully installed in the Anji Khad cable-stayed rail bridge, the first such bridge in Indian Railways, on April 26. At the crucial bridge in the Kashmir rail link project, all the cables were installed in a record time period of 11 months from June