CGS Architects put children first when designing the facility, with large play spaces, spacious bathrooms, oodles of natural light, and a porch swing out front
Two construction projects take over Regina's downtown area that have many residents frustrated the detours and the inability to get to their favourite shopping stores.
As the sun made its way across the rooftops of Petersburg, city leaders realized the Transit Building they use as a cooling station couldn't be used due to problems with the air conditioning.
Assessing the magnetic footprint of a city could be used to track its health, including a potential early warning system for pollution problems and as a tool for improving energy efficiency.
GLOVERSVILLE During his State of the City Address on Saturday, Mayor Vince DeSantis unveiled a plan for Gloversville to acquire ownership of four abandoned tannery sites, a necessary step towards applying for $5 million in federal funding to clean up contaminated soil at the properties and redeve