LIMERICK â The continuation of a hearing on a proposal to build a two-story, 112-bed assisted living senior facility on 8.5 acres at 545 Lewis Road was supposed to be about a traffic study done by the developer.
But that part of the action was taken care of quickly when the township s traffic engineer, Joe Platt, confirmed what the developer s lawyer had told the supervisors last month that issues raised about the study s findings have been addressed.
- Advertisement -
Jerrid Dinnen, with Atlantic Traffic and Design, told the board last month traffic studies show the facility would add only 21 new trips to the morning peak traffic period and 29 to the evening peak.