The Missoula Redevelopment Agency this week approved a $65,000 contract directing Cushing Terrell to design and engineer lighting the trail's 2.7-mile stretch from the south side of Missoula to the Clark Fork River.
The Missoula Redevelopment Agency on Thursday approved a $341,000 contract with HDR to study the bridge, consider its structural integrity and present a number of conceptual renderings.
A proposal to alter a railroad bridge on the Bitterroot branch line near downtown Missoula to allow bicycle and pedestrian traffic won funding to begin the project's first phase, that being a study to determine if the idea is feasible.