LONDON (AFP) – The door of the steel box lift clanks shut and a crane slowly lowers construction workers building London’s super sewer 40 metres (m) to the bottom of an enormous vertical shaft. Here, a world away from the city’s busy streets, thousands of engineers and construction staff have spent the past seven years […]
The door of the steel box lift clanks shut and a crane slowly lowers construction workers building London s "super sewer" 40 metres (130 feet) to the bottom of an enormous vertical shaft.
The door of the steel box lift clanks shut and a crane slowly lowers construction workers building London's "super sewer" 40 metres (130 feet) to the bottom of an enormous vertical shaft.The new 25-kilometre (15-mile) "super sewer", which is 7.2 metres in diameter, snakes from west to east following the curves of the river.