The notice red tagged but as i recall it was touch and go to whether ms. Top of could stay there her home in 2005. This was serious and it led to the then District Supervisor shawn. Several of the visits from the inspection namely Raymond Louie to name some. In the previous version of the construction drawings that ive reviewed in september 2013. I indicated the 24 inch would be measured to the bottom of the concrete foundation. Let me see. I think i can maybe i can work maybe i should turn it around. Okay. This is the line of the original foundation of the north foundation of 25 trouf and the bottom of the under pinning piece. We want to have the underpinning not to expose them. The agreement was to provide 25 inches to the bottom underpinning piece. The drawings show its not 24 inch to the bottom of the foundation but 24 inch to the bottom of the drain route. So i have been working with mr. Yeez and his team. Now, mr. You rained a new Structural Engineer the team was solomon to repla
In the previous version of the construction drawings that ive reviewed in september 2013. I indicated the 24 inch would be measured to the bottom of the concrete foundation. Let me see. I think i can maybe i can work maybe i should turn it around. Okay. This is the line of the original foundation of the north foundation of 25 trouf and the bottom of the under pinning piece. We want to have the underpinning not to expose them. The agreement was to provide 25 inches to the bottom underpinning piece. The drawings show its not 24 inch to the bottom of the foundation but 24 inch to the bottom of the drain route. So i have been working with mr. Yeez and his team. Now, mr. You rained a new Structural Engineer the team was solomon to replace the fan who was the Civil Engineer on the project but he since then moved out of the area and declined to participate on the project no more. I filed on appeal on december 29th on behalf of the issuing of the permit 20131188 because we wanted to see that t
Turn it around. Okay. This is the line of the original foundation of the north foundation of 25 trouf and the bottom of the under pinning piece. We want to have the underpinning not to expose them. The agreement was to provide 25 inches to the bottom underpinning piece. The drawings show its not 24 inch to the bottom of the foundation but 24 inch to the bottom of the drain route. So i have been working with mr. Yeez and his team. Now, mr. You rained a new Structural Engineer the team was solomon to replace the fan who was the Civil Engineer on the project but he since then moved out of the area and declined to participate on the project no more. I filed on appeal on december 29th on behalf of the issuing of the permit 20131188 because we wanted to see that the appropriate revision could be done to protect ms. Taungz property. Now allen of the mechanics engineer i asked the team to bring him on board so he can continue participation on the project so we can have a meeting of minds and c
Is thick. And trimming that 20 to thirty percent you cant open it up but do i understand what were considering the removal of the tree that youre willing considering putting two trees. Im willing if it fits i dont have any objection. Before you sit down. When did you occur the property it was owned by my cousin ive had it about since 2006. 2006 . So seven years yeah. Six or seven. Okay. Thank you. Well, ive moved to continue this if ms. Short is willing to work with the appellant to see if we can craft some kind of a compromise is that okay. How much time do we need. From public works. We can do it were launching the forest plan next week the 29. 29 it should be fine. Is that okay with you mr. Mcclellan. inaudible . Can you come up to the microphone mr. Mcclellan . Thank you i have a conflict but i can it looks like i can make that conflict workout. Im going to move to continue im sorry. You can sit down. I really like that tree. Its a visual and i havent been up close to see it and it
Let me see. I think i can maybe i can work maybe i should turn it around. Okay. This is the line of the original foundation of the north foundation of 25 trouf and the bottom of the under pinning piece. We want to have the underpinning not to expose them. The agreement was to provide 25 inches to the bottom underpinning piece. The drawings show its not 24 inch to the bottom of the foundation but 24 inch to the bottom of the drain route. So i have been working with mr. Yeez and his team. Now, mr. You rained a new Structural Engineer the team was solomon to replace the fan who was the Civil Engineer on the project but he since then moved out of the area and declined to participate on the project no more. I filed on appeal on december 29th on behalf of the issuing of the permit 20131188 because we wanted to see that the appropriate revision could be done to protect ms. Taungz property. Now allen of the mechanics engineer i asked the team to bring him on board so he can continue participat