The lengthy closure began March 15 when a massive sinkhole appeared during one of the many atmospheric river storms that drenched San Diego County last winter.
The workers are replacing nine 70-year-old corrugated steel pipes with high-density plastic and concrete pipes, at a cost estimated to be around $20 million