comparemela.com

Latest Breaking News On - Souza soares - Page 3 : comparemela.com

Yamana Gold Reports Strong Fourth Quarter and Full Year 2020 Results; Impressive Technical Study Results Delivered for the Odyssey Underground Project at Canadian Malartic With Construction Decision Approved; Adopts Climate Change Strategy

(1) production was 255,361 GEO (1) including gold and silver production of 221,659 ounces and 2.59 million ounces, respectively. The strong gold production followed standout performances from Jacobina and Minera Florida, and silver production was underpinned by an exceptionally strong performance from El Peñón. Full year GEO (1) production of 901,155 GEO (1), including 779,810 ounces of gold and 10.37 million ounces of silver, exceeded original guidance for the year of 890,000 GEO, and was within the plus or minus three per cent variance range of the Company s revised guidance. GEO (1) production for the year at Jacobina, El Peñón, Canadian Malartic, and Minera Florida were all well above plan. The entire difference was attributable to further changes to COVID-19 restrictions imposed in Argentina near the end of the year which impacted production at Cerro Moro.

Canada
Las-pataguas
Libertador-general-bernardoo-higgins
Chile
Catamarca
Argentina
United-states
United-kingdom
Twin-lakes
Yukon
Brazil
Escondida

Yamana Gold Reports Strong Fourth Quarter and Full Year 2020 Results; Impressive Technical Study Results Delivered for the Odyssey Underground Project at Canadian Malartic With Construction Decision Approved; Adopts Climate Change Strategy

(1) production was 255,361 GEO (1) including gold and silver production of 221,659 ounces and 2.59 million ounces, respectively. The strong gold production followed standout performances from Jacobina and Minera Florida, and silver production was underpinned by an exceptionally strong performance from El Peñón. Full year GEO (1) production of 901,155 GEO (1), including 779,810 ounces of gold and 10.37 million ounces of silver, exceeded original guidance for the year of 890,000 GEO, and was within the plus or minus three per cent variance range of the Company’s revised guidance. GEO (1) production for the year at Jacobina, El Peñón, Canadian Malartic, and Minera Florida were all well above plan. The entire difference was attributable to further changes to COVID-19 restrictions imposed in Argentina near the end of the year which impacted production at Cerro Moro.

Canada
Las-pataguas
Libertador-general-bernardoo-higgins
Chile
Catamarca
Argentina
United-states
United-kingdom
Twin-lakes
Yukon
Brazil
Escondida

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.