comparemela.com

Latest Breaking News On - Shaheen al mansoori - Page 3 : comparemela.com

Abu Dhabi s ADNOC awards $744m EPC contract to NPCC

Abu Dhabi’s ADNOC awards $744m EPC contract to NPCC The development will enable the Belbazem offshore block to achieve a crude oil production capacity of 45,000 bpd with first oil expected in 2023 by Zainab Mansoor May 25, 2021 UAE state-owned energy company Abu Dhabi National Oil Company (ADNOC) has awarded a $744m (Dhs2.73bn) contract for the full field development of the Belbazem Offshore Block. Al Yasat Petroleum Operations Company (Al Yasat), ADNOC’s subsidiary and joint venture with China National Petroleum Corporation (CNPC), awarded the contract to the National Petroleum Construction Company (NPCC). The block consists of three offshore fields – Belbazem, Umm Al Salsal, and Umm Al Dholou.

UAE: ADNOC awards USD744 million contract for full field development of the Belbazem Offshore Block

UAE: ADNOC awards USD744 million contract for full field development of the Belbazem Offshore Block 25 May 2021 EPC contract awarded by Al Yasat Petroleum, ADNOC’s joint venture with CNPC, after a competitive tender process  65% of the award value will flow back into the UAE’s economy under ADNOC’s In-Country Value program  Award will enable Belbazem to achieve crude oil production capacity of 45,000 bpd with first oil expected in 2023 $190 million (AED697.3 million) in CAPEX savings enabled through cost optimization achieved in FEED design The $744 million (AED2.73 billion) contract for the full field development of the Belbazem Offshore Block, underscoring its drive to unlock and maximize value from all of Abu Dhabi’s fields as it expands its oil production capacity to 5 million barrels per day (mmbpd) by 2030. Located 120 kms northwest of Abu Dhabi city, the

- ADNOC Awards $744 Million Contract for

ADNOC Awards $744 Million Contract for Full Field Development of the Belbazem Offshore Block édité le 25/05/2021 - Plus de news de ADNOC - Voir la fiche entreprise de ADNOC The Abu Dhabi National Oil Company (ADNOC) announced, the award of a $744 million (AED2.73 billion) contract for the full field development of the Belbazem Offshore Block, underscoring its drive to unlock and maximize value from all of Abu Dhabi’s fields as it expands its oil production capacity to 5 million barrels per day (mmbpd) by 2030. Located 120 kilometers northwest of Abu Dhabi city, the Belbazem Block consists of three so-called marginal offshore fields; Belbazem, Umm Al Salsal, and Umm Al Dholou.

NPCC wins $744m contract for Abu Dhabi offshore project

NPCC wins $744m contract for Abu Dhabi offshore project ABU DHABI, 5 days ago UAE-headquartered National Petroleum Construction Company (NPCC) said it has won a $744-million engineering, procurement and construction (EPC) contract for the full field development of the Belbazem Offshore Block in Abu Dhabi.    The contract was awarded by Al Yasat Petroleum Operations Company, a joint venture between Abu Dhabi National Oil Company (Adnoc) and China National Petroleum Corporation (CNPC)   Located 120 km northwest of Abu Dhabi city, the Belbazem Block consists of three marginal offshore fields; Belbazem, Umm Al Salsal, and Umm Al Dholou.   Adnoc and CNPC hold 60 per cent and 40 per cent stakes in Al Yasat respectively, underpinning the strong bilateral ties and energy partnership between the UAE and China.

ADNOC Announces $744MM Contract Award

ADNOC announced on Tuesday the award of a $744 million contract for the full field development of the Belbazem Offshore Block. The Abu Dhabi National Oil Company (ADNOC) announced on Tuesday the award of a $744 million (AED2.73 billion) contract for the full field development of the Belbazem Offshore Block. Al Yasat Petroleum Operations Company Ltd (Al Yasat) - ADNOC’s subsidiary and joint venture with China National Petroleum Corporation (CNPC) - awarded the engineering, procurement, and construction (EPC) contract to the National Petroleum Construction Company (NPCC). The scope of the award covers engineering, procurement, construction, and commissioning activities for the offshore facilities required to enable full production capacity of 45,000 barrels per day of light crude and 27 million standard cubic feet per day of associated gas from Belbazem, ADNOC outlined. First oil from the asset is expected in 2023.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.