Equinor has awarded a Front-End Engineering Design (FEED) contract for H2H Saltend to Linde Engineering, and an operation and maintenance service contract to BOC. H2H Saltend is a 600-megawatt low carbon hydrogen production plant with carbon capture, the first of its kind and scale, helping to establish the Humber as an international hub for low carbon hydrogen.
(Page 1) Equinor Energy AS (Stavanger, Norway) has awarded a Front-End Engineering Design (FEED) contract for H2H Saltend to Linde Engineering, and an operation
Equinor awarded a front-end engineering design (FEED) contract for the low-carbon hydrogen production plan H2H Saltend to Linde Engineering. Equinor also awarded an operation and maintenance service contract to Linde company BOC.
Equinor awarded a front-end engineering design (FEED) contract for the low-carbon hydrogen production plan H2H Saltend to Linde Engineering. Equinor also awarded an operation and maintenance service contract to Linde company BOC.