comparemela.com

Latest Breaking News On - Robin steele - Page 4 : comparemela.com

Pastor Robin Steele – How to be Made Whole

Fort Wayne, IN / STAR 88.3 Mar 12, 2021 12:00 PM Pastor Robin Steele, Founder and Lead Pastor of PromiseLand Church in San Marcos, TX, is the Author of “How to be Made Whole” and he shares the story of his daughter.  He talks about letting go of our control and recognizing that God is in control. For more information: 

Pastor Robin Steele – How to be Made Whole

Pastor Robin Steele, Founder and Lead Pastor of PromiseLand Church in San Marcos, TX, is the Author of "How to.

Transcripts For SFGTV 20121014

that s a summary of my arguments and i m available for any questions the board may have. mr. sanchez, if the rear of this property was higher than the street curb, he would be able to go 35 feet from a midpoint, right, across the lot? that would establish an envelope that is parallel to the slope if it s higher in the rear. i think there are a couple important points. if the rear property line is 20 feet or more higher than the front, then the 35 foot height limit doesn t aplay and you are back to the 40 foot height limit. also in the planning code, the definition of height and how to measure height on up sliping lots it actually follows grade. so if this wasn t a flat lot, if it was an upsloping lot, yes, they could arguably have more flexibility in having a taller building. it would be easier it accomplish a 4 story building. the base and the level may be slightly below grade at the rear but if it s an upsloping lot either 20 feet or more, it follows grade so it would b

Transcripts For SFGTV 20121014

. i do have a question, i m not sure to whom to address it, but clearly there s concern about getting these mock ups looked at by interested parties and i don t know that i heard anything that kind of assures that there s proper notice given to interested parties. can somebody address whether, somebody that s been a party to the original application or whatever would notify that these mock ups are available for viewing? good evening, commissioners, i m elizabeth murray, the manager director for the war memorial. that notification would come through my office and we provide notification to all of the american legion posts on various different issues and we would take care of that matter as well. we would, of course, provide the same notice to the other trust beneficiaries of that building. thank you. is it just to address the question of notice, please. we re concerned we may not get notice. that s why we need the protection of the historic preservation staff. twice th

Transcripts For SFGTV2 20121011

dated february 3, 2012, and it s also contradicted by the site set a-400, our exhibit 7. it s those contradictions that caused us to take a hard look at why there wasn t a condition of approval, namely that the historic preservation staff retain approval of the details of what the skylights are actually going to consist of. and what we ve heard today is consistent with that objective because we ve heard from the proponents, the respondants, that they are going to submit that to the staff so quit making that a requirement is really no harm at all. it s consistent with what they are good to go do. well, let s make it a real condition. miss lamont, you have rebuttal, 3 minutes if you care to use it. tara lamont from dpw we have been developing the project over the last year and when we started, as i mentioned earlier at the early drawings we first thought we would do steel, then the reason to do aluminium is because it has better performance characteristics and we found we c

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.