The Pennsylvania Department of Transportation released plans online Friday for bridge replacement projects in Paradise Township, Strasburg Township and Christiana Borough.
The online listings, which will be viewable until March 1, offer a chance for public comment on the projects which are all slated to take place sometime during 2022. Construction work for each bridge is expected to last six months.
Strasburg Road Over Eshleman Run (Paradise Township): Replacement of the 90-year-old single span concrete slab bridge that carries Route 741 over Eshleman Run, about four miles east of Strasburg. A precast reinforced concrete box culvert will be installed and the bridge roadway will be widened. 90-day bridge closure expected. Detour via Route 896 and Belmont Road.