Repsol Sinopec Resources UK, TechnipFMC and Petrofac have announced that pre-front end engineering and design studies (Pre-FEED) have commenced for the development of the Ithaca and Hibiscus owned Marigold field via the Repsol Sinopec-operated Piper Bravo platform.