they report going back to work in 2018 done by a critical critical of the state of the building. the engineer said visual observations revealed many of the previous garage, concrete repairs are failing resulting in cracking. new cracks are radiating from the original repair contracts, which is evidence of poor workmanship performed by the previous contractor. that was three years ago. officials say in the last three years, the state of the building had become desperately in disrepair as the condo association president put it. so there were a lot of red flags. as the search goes on, the mayor of miami-dade county says this is a wake-up call to audit all older buildings in the county. take a listen. i will be meeting with experts from multiple relevant fields so that my staff and i can develop a set of