Dulux Construction Solutions worked closely with the engineering firm, Diagnostech on the restoration of a heritage-listed apartment building in Elizabeth Bay NSW.
Having worked on several Detention Centres’ flooring, Sikafloor MultiDur ET-14 epoxy flooring was found to be the most suitable for selected access walkways and holding cells to perform this task.
Knowing the hygiene requirements of a health and medical related environment, the flooring solution was required to be Clean Room Certified, Low VOC, hardwearing, slip-resistant and very easy to clean.