Uttarakhand CM suspends two engineers in substandard road construction matter ANI | Updated: Mar 17, 2021 20:22 IST
Dehradun (Uttarakhand) [India], March 17 (ANI): Taking strict action on the matter of substandard road construction, Uttarakhand Chief Minister Tirath Singh Rawat has instructed to suspend the two engineers of the Public Works Department (PWD).
According to a statement from the Uttarakhand Chief Minister s office, orders have been issued by the principal secretary PWD to suspend both the engineers.
The Chief Minister took the matter which went viral on social media and gave instructions to suspend AE Ajit Singh and JE Anil Kumar in the case of poor road construction in km 154-155 of Laxmanjhula-Kandi-Dugadda-Rathuvadhab-Dhumakot motorway in Dugadda Public Works Provincial Section.
Maharashtra chief minister Uddhav Thackeray. (File photo)
MUMBAI: In a case that points to a serious breach within the state headquarters Mantralaya, a file with chief minister Uddhav Thackeray’s signature was tampered with to scuttle a probe.
A case of cheating and forgery has been registered at Marine Drive police station.
Thackeray had signed a file to endorse a departmental inquiry against a PWD superintending engineer. However, a forged remark was later written in red ink above his signature, saying that the inquiry should be closed.
“An FIR has been registered against unknown persons and investigations are on,” said DCP Zone 1 Shashikumar Meena.
File signed by Maharashtra Chief Minister Uddhav Thackeray tampered
File signed by Maharashtra Chief Minister Uddhav Thackeray tampered
ByPriyanka KakodkarPriyanka Kakodkar / Updated: Jan 24, 2021, 11:12 IST
Maharashtra chief minister Uddhav Thackeray. (File photo)
MUMBAI: In a case that points to a serious breach within the state headquarters Mantralaya, a file with chief minister
Uddhav Thackeray’s signature was tampered with to scuttle a probe.
A case of cheating and forgery has been registered at Marine Drive police station.
Thackeray had signed a file to endorse a
departmental inquiry against a PWD superintending engineer. However, a forged remark was later written in red ink above his signature, saying that the inquiry should be closed.