21st Austria weekly - Andritz Vienna Stock Exchange S Immo 03/01/2022 [pic1]Andritz: The Andritz biomass-fired PowerFluid circulating fluidized bed boiler with flue gas cleaning system delivered to Mitsui Engineering and Shipbuilding for the biomass power plant in Ichihara Chiba Prefecture has been commercial operation since December 2020 – after fulfilling all performance guarantee parameters November as planned. Ichihara reached end of warranty period 2021. total project execution time from award order beginning was only 39 months thus confirming Andritz’s strong capabilities management timely demanding projects.Andritz: performance: 1.19%
21st Austria weekly - Andritz Vienna Stock Exchange S Immo 03/01/2022 [pic1]Andritz: The Andritz biomass-fired PowerFluid circulating fluidized bed boiler with flue gas cleaning system delivered to Mitsui Engineering and Shipbuilding for the biomass power plant in Ichihara Chiba Prefecture has been commercial operation since December 2020 – after fulfilling all performance guarantee parameters November as planned. Ichihara reached end of warranty period 2021. total project execution time from award order beginning was only 39 months thus confirming Andritz’s strong capabilities management timely demanding projects.Andritz: performance: 1.19%