comparemela.com

Latest Breaking News On - Pete tuell - Page 1 : comparemela.com

Bangor s downtown pedestrian bridge arrives and is lifted into place

The $1.2 million bridge connects Pickering Square with Hancock Street by crossing the Kenduskeag Stream. Author: Bob Evans (NEWS CENTER Maine) Published: 4:00 PM EDT April 8, 2021 Updated: 5:46 PM EDT April 8, 2021 BANGOR, Maine Several large sections of Bangor’s pedestrian bridge arrived and were lifted into place Thursday. Pete Tuell, the senior project manager with Haley Ward said all five of the nearly 80-foot pre-engineered steel replacement structures should be in place by Saturday. A study in 2016 determined the old Willard C. Orr footbridge had reached its life expectancy and needed to be replaced. The $1.2 million bridge connects Pickering Square with Hancock Street by crossing the Kenduskeag Stream.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.