NTPC Ltd, India s largest power generator, along with its subsidiaries, has crossed a combined installed capacity of 73,000 MW (73 GW). The central PSU achieved this milestone after the second unit (660 MW) of stage 1 of its 3,300 MW Barh thermal power project was commissioned.