NHIDCL, the firm building the tunnel, in a report released to media Monday afternoon said that while removal of loose muck continues along with shotcreting (concrete spraying) inside the tunnel, the strategy is to push inside a steel pipe of 900 mm diameter with the help of a hydraulic jack to evacuate the trapped workers.