If the event goes ahead, New Westminster would like the Ministry of Transportation and TransLink to host the party in order to minimize the strain on municipal staff and resources.
If the event goes ahead, New Westminster would like the Ministry of Transportation and TransLink to host the party in order to minimize the strain on municipal staff and resources.
The three-day festival of music, food and foot traffic is designed to bid farewell to the 85-year-old bridge, whose replacement is slated to open 2024.
The three-day festival of music, food and foot traffic is designed to bid farewell to the 85-year-old bridge, whose replacement is slated to open 2024.