Construction of the South Australian section of the $2.3 billion (USD 1.56 billion) EnergyConnect infrastructure project, which will link power grids across three states, is now more than 50% complete with ElectraNet announcing the high-voltage interconnector is on track for release of full power transfer capability by mid-2026.