According to a senior officer of Mumbai Rail Vikas Corporation, newly constructed foot-over bridge of CSMT end is 6m wide and 46 meter long. Similarly foot over bridge constructed at Kalyan end of Mumbra station is 4.2 mete width and 27 long and middle foot over is 6m wide and 24m long .
Apart from that for long term solution creation of one more holding ponds of 17000 square metres was also suggested by IIT Bombay in the BMC area of Dadar- Lower Parel section. All these ponds will be underground.