The Mumbai Metro Line 2A project was executed by Delhi Metro Rail Corporation (DMRC) on behalf of Mumbai Metropolitan Region Development Authority (MMRDA), which takes care of civil construction work of the elevated metro lines in MMR.
The depot will be equipped with a simulator, on the lines of aircraft simulators, which will offer training to Metro train pilots and operators through real-time simulation.
The much awaited Mumbai Metro Line 3 between Cuffe Parade and SEEPZ is finally opening for public use in December. Get further more details on routes, stations, travel options and fantastic amenities at news18.com
The Mumbai Metropolitan Region Development Authority (MMRC) has received 5 of the 9 rakes needed for the Aarey-BKC Metro services. The rakes have been manufactured by Alstom, and they are currently being tested at the MMRC's depot in Aarey. The corridor is expected to be operational by December 2023 - , Mumbai News, Times Now