In 1997-98 fiscal, a bridge was constructed over Bhulli river, connecting Nilphamari and Dinajpur. However, over half of the concrete structure washed away into the river following a flood in 2017.
In 1997-98 fiscal, a bridge was constructed over Bhulli river, connecting Nilphamari and Dinajpur. However, over half of the concrete structure washed away into the river following a flood in 2017.