comparemela.com

Latest Breaking News On - Modified horse shoe shaped - Page 1 : comparemela.com

Geological report on tunnel shows weak rock, slip circle failure near Silkyara

The vertical drilling of the hill in Silkyara commenced on Sunday afternoon, with around 110 meters of the hill to be dug out to rescue the trapped workers. In a fast-paced operation, the machine has already drilled 20 meters of the hill, with around 86 meters still left | Latest News India

Barkot
Uttaranchal
India
Naveen-juyal
Mahmood-ahmad
Anshu-manish-khalkho
File-photo
Char-dham
Main-central-thrust
Manish-khalkho
Modified-horse-shoe-shaped

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.