staff reportermanoj arora, railway safety commissioner, central railway, mumbai, inspected the barkheda-budhni third line (26.50 km) situated on bhopal-itarsi track under west central railway on saturday. while visiting
The total length of five tunnels - T1 (Budhni), T2 (Midghat), T3 (Bhimkoti), T4 (Choka) and T5 (Barkhera) is 2,150.00 metres. Besides, 20 underpasses and five overpasses are also being constructed. A stop dam will also be built.