comparemela.com

Mega Jacks News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Big Jack, Mega Jack burgers back at Hungry Jacks stores after Maccas sues over trademark infringement

Above and below the ground - Cranes Today

Above and below the ground - Cranes Today
cranestodaymagazine.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from cranestodaymagazine.com Daily Mail and Mail on Sunday newspapers.

Mammoet installs pedestrian bridge in Colorado

Precise planning was required for this job, as the installation required crossing eleven railroad tracks. The railroad authorities gave an eight-hour work window to complete the entire installation of the bridge. The 76m prefabricated.

Pedestrian Bridge Installed in 5 Hours

SHARE January 11, 2021 Colorado s new 550 ton pedestrian bridge. Photos courtesy of Mammoet. A Mammoet team has installed a 550 ton pedestrian bridge over 11 rail tracks in less than five hours, according to a report in the Construction Index. Kiewit Infrastructure appointed Mammoet for the work, which is part of the revitalisation effort in downtown Colorado Springs.  Prior to Mammoet’s arrival, the 249-foot prefabricated bridge was assembled, welded together, and given a concrete walking surface. Once on site, Mammoet crews used eight 500-ton  Mega Jacks to hoist the bridge close to 23 feet in the air to allow for the installation of self-propelled modular transporters for transport. 

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.