OFFLOADING the first shipment of turbine blades for the Viking Energy wind farm is underway at the Greenhead Base in Lerwick today (Friday). The first consignment of 57 metre long blades arrived on board the BBC Belem on Thursday afternoon. Offloading and storage will continue.