The proposals would see five new stations built at Pencader, Llanybydder, Lampeter, Tregaron and Llanilar, with an overall estimated cost of around £620M.
How long will it take for North and South Wales to be united by a railway? The sad thing is such a line used to exist, and pressure is growing for the railway to