comparemela.com

Lavlin Worley News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Moltex Small Nuclear Reactor Should Be Operational By Early 2030s

Rendering of a potential Moltex SMR site. Image: submitted. The Moltex Clean Energy small modular reactor (SMR) should be installed and operational by the early 2030s, the company said in a virtual update Monday. The Moltex “Stable Salt Reactor – Wasteburner (SSR-W)” is a small nuclear reactor being developing with NB Power. It will be installed at Point Lepreau and is expected to bring carbon-free electricity by the early 2030s. Moltex Clean Energy announced their concept design of the SSR-W has been finalized with the engineering design in progress. The first phase of the Vendor Design Review is being finalized with phase two and licensing preparations underway.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.