Mysore/Mysuru: In a bid to expedite ongoing projects,
Mysuru Urban Development Authority (MUDA) Chairman H.V. Rajeev inspected several ongoing major Civil and other infrastructure works in and around the city this morning.
He first visited water storage tank at Vijayanagar First stage, where works are underway for 24×7 drinking water supply. Later, he inspected the widening and development works of the road leading from CITB Kalyana Mantap at Hebbal to the Outer Ring Road. This road widening and other associated civil works have been taken up at an estimated cost of Rs. 4.98 crore. The works include asphaltation of 3.15 km stretch, construction of median and carriageway of 7.5 mt. width on both sides, building box drainages along the road wherever necessary and cobble stone pavement of footpath on either side.