Nepal on Sunday decided to allow India's Satluj Jal Vidyut Nigam (SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024.
At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024.
India s Satluj Jal Vidyut Nigam is currently building a 900-MW Arun -III hydropower project on the Arun River in Eastern Nepal, with a completion date of 2024