KUALA LUMPUR, Aug 1 Construction of the Nenggiri hydropower project in Gua Musang, Kelantan, with a capacity of 300 megawatts, will be continued by TNB Power Generation Sdn Bhd.
Johor’s Orang Seletar, struggling over the past two years due to the Covid-19 pandemic, are hoping for aid from the new state govt as they wait for life to return to normal.
People in the flood-prone areas of Kelantan and Terengganu have taken all the necessary precautions to face a possible second or third wave of the floods
KUALA LUMPUR: Residents in the flood-prone areas of Kelantan and Terengganu have taken all the necessary precautions to face a possible second or third wave of the floods.
SOME 20 people including a disabled person in a wheelchair, seniors and children are still stranded in the flood at a house located in Kuala Sg. Baru in Batu 13, Puchong.