The proposed plan to use the approximately 60-acre Kelley Mine yard site as a repository site for the waste material and then cap it off with 18 inches of clean soil and vegetation.
Atlantic Richfield is considering options for transporting and sequestering contaminated mining and smelting wastes. One option for a repository could be the polluted Berkeley Pit.