In line with the procurement, fabrication, and construction strategy for the Empower Calgary Facility, the Rotochopper was manufactured and assembled off site and delivered fully assembled to the Empower Calgary Facility.
The Company will be paid a tipping fee by IKO on a per tonne basis for the waste shingles, thus representing the Company's first revenue from the Empower Calgary Facility.
Once fully operational, the Empower Calgary Facility is expected to have a carbon footprint 60 per cent lower than the base case of landfill and asphalt replacement with virgin production.