HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of May 26…
Work on the I-64 Southside Widening and High Rise Bridge Project will require additional closures during the winter months, according to the Virginia Department of Transportation (VDOT).
A blockage in a pipe that began Christmas Eve is what HRSD crews believe caused sewage to overflow near Great Bridge Boulevard and Neal Street in Chesapeake.
The Hampton Roads Sanitation District (HRSD) is testing water quality after 2,500 gallons of sewage spilled from a sewer line on Christmas Eve in Chesapeake.