The electric two-wheeler maker is also working to increase its own charging network to 2,500 by March 2024 from the current 1,600 even as it is in talks with other manufacturers for adoption of its charging connector.
The Ministry of Road Transport and Highways has deferred the tough EV battery standards (AIS-156 and AIS-038) that were formulated after several battery fires reported in the first six months of the year, shaking customers trust in EV two-wheelers.