Benz Mining Corp.: Benz Mining: Multiple New Conductors Open Eastmain to the North
FLEM identify multiple conductors 2.5km north of the Eastmain Mine at Placer Lake
Conductors extend over strike length of approximately 2km and coincident with historical rock chip samples of 8.3g/t gold at surface and untested by drilling
Total strike length of conductors exceeds 6km highlighting the potential scale of the district
In excess of 130 FLEM and DHEM modelled conductors have been identified by Benz Mining
Placer Lake conductors will be tested as part of ongoing 50km fully funded drill program
2 drill rigs currently on-site drilling over 1,000m of core per week
Benz Mining Corp.: Benz Mining: 50,000m Diamond Drilling Program and Large Surface EM Survey Underway at Eastmain
First target of 2021 drill season is the newly identified footwall conductors
Numerous untested conductors from the 2020 EM campaign to be drilled in priority
FLEM underway covering 3km of potential strike extent of two trends (main mine trend and new hangingwall trend) with 2.13g/t Au rock chip sample at surface and 1m at 6.3g/t Au in an isolated shallow historical drillhole
Additional VTEM targets 1km in the hangingwall of the mine trend potentially linked to an untested additional conductive trend
2020 drilling assays expected in coming weeks
Benz Mining Corp.: Highly Successful Maiden Exploration Campaign Identifies New Mineralized Trend at Eastmain
Maiden 7,110m, 12-hole diamond drill program successfully completed at Eastmain
Drilling targeted a combination of fixed-loop and borehole electromagnetic conductors identified in the recent geophysics campaigns
110 line-km FLEM survey identified multiple conductors along strike of the known Eastmain Mine mineralization and highlighted potential structural repeats and new parallel mineralized horizons
BHEM in 38 historical drill holes identified target extensions to known mineralized zones
All holes drilled this year have intersected quartz veins associated with sulphides
Visible gold identified in the first holes drilled into a new undrilled parallel trend