comparemela.com

Latest Breaking News On - East sampson dam - Page 1 : comparemela.com

Moho Resources Ltd intersects high-grade bedrock gold at Silver Swan North Project

Moho Resources Ltd (ASX:MOH) has intersected high-grade bedrock gold mineralisation within a broader zone of gold and arsenic anomalism at the Silver Swan.

Moho Resources Ltd encouraged by additional gold potential at Tyrells Prospect

Moho Resources Ltd (ASX:MOH) is encouraged by the final assay results received from the 2021 aircore program at the Tyrells and Hodges gold prospects within.

Moho Resources Ltd is highly leveraged to exploration success with an EV of $6 million: IIR

Moho Resources Ltd has aircore drilling underway at gold prospects adjacent to East Sampson Dam

Moho Resources has aircore drilling underway at gold prospects adjacent to East Sampson Dam The company believes the area could host further gold mineralisation to that already identified at East Sampson Dam. Aircore drilling in progress at Hodges prospect within Silver Swan North Project. Moho Resources Ltd (ASX:MOH) has started an aircore drilling program at the Tyrells and Hodges prospects immediately north of the East Sampson Dam (ESD) gold deposit within the Silver Swan North Project, Western Australia. The drill program is targeting gold anomalism identified by an auger soil program. Moho has planned about 8,000 metres of aircore drilling to test a 2.5 kilometres long zone of gold anomalism to the north of ESD.

Moho Resources Ltd looking to golden future as Western Australian projects build momentum

Moho Resources Ltd (ASX:MOH) is making strong progress towards its goal of becoming a gold producer, with its two Western Australian projects generating considerable newsflow in the past two months. Moho wholly owns the Silver Swan North Gold-Nickel Project, covering about 112 square kilometres northeast of the famed mining precinct of Kalgoorlie, and has a 70% holding in the Burracoppin gold joint venture project alongside IGO Ltd (ASX:IGO) (OTCMKTS:IPGDF). Excitingly, Moho has just released a promising interim mineral resource estimate for the East Sampson Dam (ESD) prospect within the Silver Swan North project of 264,000 tonnes at 2.5 grams per tonne (g/t) of gold for 21,600 ounces at a cut-off grade of 0.5 g/t.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.