comparemela.com

Latest Breaking News On - Diana kusumastuti - Page 8 : comparemela.com

Government to promptly address Bali s waste problems before G20 Summit

Ministry heeds traders suggestions on Legi Market s arrangement

The Public Works and Public Housing (PUPR) Ministry remains committed to accommodating the traders’ suggestions regarding the arrangement of Legi .

PUPR Ministry starts trial of indigenous 3D Concrete Printing tech

The Public Works and Public Housing (PUPR) Ministry is conducting a trial of a three-dimensional (3D) Concrete Printing technology developed by Indonesian .

Govt to make two drinking water projects operational in 2024

The Ministry of Public Works and Public Housing (PUPR) will develop two drinking water systems (SPAM), Jatiluhur 1 and Karian Serpong, for Jakarta and .

Modernizing Bali s Most Religious Site

Pura Besakih would take two years to complete starting from 2021.  The parking garage will be four-story-high, covering 55,201 square meters. This space will be able to accommodate 1,369 cars, 61 medium-sized busses, and five large busses. To limit outside lighting pollution, the new parking facility will feature lower-level voids illuminated from within. These voids will also assist in the circulation of fresh air. The new parking facility will also use solar energy panels as part of the drive to achieve sustainable energy. The inspiration and motivation for the parking structure is a desire to reduce traffic congestion by increasing parking capacity at the complex while at the same time preserving the natural environment and design integrity of Bali’s most religious site. 

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.